Office
Low carbon
Zero Carbon
Office
5000
Features and description
- Opening windows
- Exposed soffits with min. 2.7m clear height from floor to underside of services
- Exposed services
- Heating, cooling and ventilation provided by efficient 4 pipe fan coil units
- Designed for tenants with Net Zero Carbon operational expectations
- Flexible floorplates ready for fit-out
- Opportunity for natural connections between floors
- A rooftop terrace on level 9 with panoramic views across the city
- Inclusive gender neutral WC facilities on all floors
- Cycle parking for 200 bikes and changing facilities with 24 showers
Paying homage to its historic location while helping realise the potential of the wider estate, 3 Chamberlain Square delivers 177,000 sq ft of office space over 10 stories and forms an integral part of the Paradise development.
Situated at the heart of Birmingham's prime office core. With its low energy, low carbon design, it works as both a beautiful and inspiring new building and one that is driving the evolution of the city's commercial workplace.
Wellness and sustainability are key design features. End of trip facilities include 24 showers, drying room and 200 bike spaces. The floor plates extend to 22,000 sq ft and offer an abundance of natural light and the ability to construct dedicated staircases between floors. A roof top terrace is situated on the 9th floor, providing stunning views of the city. The buildings inclusive design features gender neutral toilets on all floors.
The building will be available for occupation post construction during Q2 2025.
Situated at the heart of Birmingham's prime office core. With its low energy, low carbon design, it works as both a beautiful and inspiring new building and one that is driving the evolution of the city's commercial workplace.
Wellness and sustainability are key design features. End of trip facilities include 24 showers, drying room and 200 bike spaces. The floor plates extend to 22,000 sq ft and offer an abundance of natural light and the ability to construct dedicated staircases between floors. A roof top terrace is situated on the 9th floor, providing stunning views of the city. The buildings inclusive design features gender neutral toilets on all floors.
The building will be available for occupation post construction during Q2 2025.
Property information from this agent
About this agent

Avison Young - Offices





