Industrial unit
Industrial unit
1458
Features and description
- Phase I consisting of 9 units across two blocks
- Units from 1,453 sq. ft. to 2,905 sq. ft.
- Purchase or lease options
- Allocated parking
- 3 phase power
- Dual Car Charger (22kw) to each unit
- Phase 1 - Practical Completion February 2024
Description
The scheme comprises 15 industrial units across 5 blocks.
Construction of Blocks, A, B & D completed in April 2024 and are ready for occupation. Blocks C & D have a target practical completion date of June 2024.
The units are of steel portal frame construction, with insulated power floated concrete floors, low brick fascias and high quality 100mm insulated cladding to walls and 120mm cladding to the roofs, with PV panels fitted.
The units have the benefit of storage mezzanines (5.0kN/m² load capacity) with front to back orientation.
Windows are located at ground and first floor levels providing capabilities for conversion to office subject to the necessary planning permissions and building regulations.
• Allocated parking with overflow available (separate agreement)
• LED lighting throughout including High Bay
• EPC A rating
• Power floated insulated concrete floor and c/board covered mezzanine
• Galvanised steel
• Single 22 kw car charger to each unit
• Estate CCTV
• Powered roller door.
• BT Openreach Fibre broadband line to each unit
• 3 phase power
Location
The estate is located on Knowle Lane in Fair Oak adjacent East Horton Business Park office development and opposite Deer Park Farm Industrial Estate, which comprises a mix of industrial occupiers.
The site benefits from excellent road transport links with M27 Junction 7 approximately 3 miles to the south and M3 Junction 13 approximately 4.5 miles to the west or alternatively Junction 11 which is approximately 5.75 miles to north.
The scheme comprises 15 industrial units across 5 blocks.
Construction of Blocks, A, B & D completed in April 2024 and are ready for occupation. Blocks C & D have a target practical completion date of June 2024.
The units are of steel portal frame construction, with insulated power floated concrete floors, low brick fascias and high quality 100mm insulated cladding to walls and 120mm cladding to the roofs, with PV panels fitted.
The units have the benefit of storage mezzanines (5.0kN/m² load capacity) with front to back orientation.
Windows are located at ground and first floor levels providing capabilities for conversion to office subject to the necessary planning permissions and building regulations.
• Allocated parking with overflow available (separate agreement)
• LED lighting throughout including High Bay
• EPC A rating
• Power floated insulated concrete floor and c/board covered mezzanine
• Galvanised steel
• Single 22 kw car charger to each unit
• Estate CCTV
• Powered roller door.
• BT Openreach Fibre broadband line to each unit
• 3 phase power
Location
The estate is located on Knowle Lane in Fair Oak adjacent East Horton Business Park office development and opposite Deer Park Farm Industrial Estate, which comprises a mix of industrial occupiers.
The site benefits from excellent road transport links with M27 Junction 7 approximately 3 miles to the south and M3 Junction 13 approximately 4.5 miles to the west or alternatively Junction 11 which is approximately 5.75 miles to north.
Property information from this agent
About this agent

COMMERCIAL PROPERTY CONSULTANCY BASED IN FAREHAM & SOUTHAMPTON COVERING HAMPSHIRE AND THE SOUTH COAST Hellier Langston is a leading south-coast commercial property consultancy, acting for a wide range of commercial property owners and occupiers within the offices, industrial and retail sectors, as well as for clients in residential and commercial land sales and acquisition.













Floorplans (