Skip to main content

No longer on the market

This property is no longer on the market

Lot 1
Lot 1
Lot 1
Lot 1
Lot 1
Lot 1
Lot 1
Lot 1
Lot 1
Lot 1
Lot 1

Land

Premium display
Land
10,489.39 acre(s)
Added > 14 days

Key information

TenureFreehold
Council taxAsk agent

Features and description

  • CLOSING DATE SET – 12 NOON 2nd AUGUST 2023
  • Late rotation forest with weighted average age of 35 years
  • Productive timber area 2740 hectares (78% Sitka Spruce)
  • Estimated potential timber harvesting of 150 - 200ha per annum over next 10 - 15 years
  • Sustainability and natural capital opportunities
  • Additional income from wind farm lease comprising 39 turbines with a total installed capacity of 89.7 MW

Video tours

Late rotation commercial forest and heritable interest in operational wind farm lease

Description

Griffin Forest extends to 4,090 hectares, and Ballinloan A to 154 hectares. The productive timber area at Griffin is 2,663ha (65%) and at Ballinloan A is 80.99ha (53%). Both forests are late rotation and the weighted average age is 35 years old. While the commercial crop age range is from 1 - 43 years, only 425.17ha are less than 33 years old, which is mostly recently restocked Sitka Spruce of between 1 - 3 years.

The other conifers include areas of Larch, Pine and Fir planted for species diversity and there is a small area of veteran Scots Pine around Loch Kennard which dates from pre.1860.

The forest includes an extensive area of open land, much in relation to the wind farm lease area, with communities of rich alpine-artic flora and other interesting habitats. Within the
open area, the lochs provide an interesting feature with a total 45 hectares of open water. The largest loch is Loch Kennard.

The Griffin Wind Farm was commissioned and accredited to the Renewable Obligation in 2012. The whole wind farm comprises 68 turbines, each with a rated capacity of 2.3 MW, and is operated by GreenPower (Griffin) Limited. Griffin and Ballinloan A together comprise 39 turbines with a total installed capacity of 89.7 MW. 37 of these turbines (total 85.1 MW) are located within Griffin Forest, and two turbines (total 4.6MW) are in Ballinloan A.

The current term of the wind farm lease extends to 2037. In line with market trends, the expectation is for this to be extended and the wind farm site repowered, but this will be
subject to the necessary consents. The wind farm has been developed with a high degree of sensitivity and most of the turbines are hidden from the public road network by the natural contours of the surrounding Perthshire landscape.




Acreage: 10489.395 Acres

Directions

The property is situated north of Perth, west of the A9, and may be accessed from the south via the A822 from Dunkeld, then via the A826 to Aberfeldy along which there are several access points as described on the sale plan. From the north there is access via the A827 Ballinluig to Aberfeldy road, off which there is an access at point A as marked on the sale plan.
Visit agent website

About this agent

Savills - Perth, Country Houses
Savills - Perth, Country Houses
Earn House Broxden Business Park PH1 1RA
01738 301816
Full profileProperty listings
Savills Perth serves an area of 2,000 square miles, but despite this huge patch, we don’t spread ourselves thinly. The breadth of our services and the depth of our expertise mean that everything we do can be carefully targeted to maximise the market.Whether we’re dealing with family homes, weekend bolt-holes or prime farmland, we’ve got the teams and the knowledge to get the best possible results for clients and applicants.
... Show more

See more properties like this

*Disclaimer and call rate information...